shunting
英 [ˈʃʌntɪŋ]
美 [ˈʃʌntɪŋ]
v. 使(火车或火车车厢)转轨; 调往,转至(次要的地方)
shunt的现在分词
BNC.45230
柯林斯词典
- VERB (通常因为不方便而)将…转移至别处,将…调往别处
If a person or thingis shuntedsomewhere, they are moved or sent there, usually because someone finds them inconvenient.- He has spent most of his life being shunted between his mother, father and various foster families...
他一生中的大部分时间都在他母亲、父亲及各种各样的寄养家庭之间辗转度过。 - Independent thinkers are shunted into minor jobs or refused promotion.
见解独到的人士要么被调往次要的岗位,要么就不被提升。
- He has spent most of his life being shunted between his mother, father and various foster families...
- VERB 使(火车车皮或车厢)转轨
When railway enginesshuntwagons or carriages, they push or pull them from one railway line to another.- The GM diesel engine shunted the coaches to Platform 4.
通用柴油动力火车头将车厢转轨到了 4 号月台。
- The GM diesel engine shunted the coaches to Platform 4.
双语例句
- Objective To analyse the causes of shunt obstructions after ventriculoperitoneal shunting for children hydrocephalus and their therapy.
目的分析脑室&腹腔转流术治疗小儿脑积水后转流管阻塞的原因及对策。 - How to check the filament real-time status of white light signal in a shunting signal is discussed deeply in the case of not affecting stability and safety of signal equipment in use.
在不影响现有设备稳定性和安全性的前提下,对实时检查调车信号机白灯灯丝的情况进行探讨。 - Shunting route: in principle, the persons who handle shunting route shall manually release the remaining shunting route.
调车进路:原则上由办理调车进路方的人员,负责人工解锁该调车进路的遗留进路。 - The boxcars can be rearranged at a shunting yard that has an input track, an output track, and K holding tracks between the input tracks and output tracks.
该车厢可以重新排列在一个调车场具有一个输入采样,输出跟踪,和K之间举行的输入和输出轨轨道轨道。 - Some shunting buttons can be used as option buttons at the same time.
某些调车按钮可兼作变通按钮。 - Also in the AC voltage mode, low-input shunting capacity is necessary for high-frequency operation.
在AC(交流)电压模式中,低输入的分流容量对高频率的操作运行是必要的。 - Some surgeons believe that shunting of the obstructed lateral ventricle is sufficient unless local mass effect causes symptoms.
有的外科医生认为除非具有明显的占位效应,导致症状,否则受阻侧脑室分流就可以了。 - First, it discusses the technical and economic feasibility for the shunting monitoring system to use DGPS technology.
首先,本文从技术和经济两方面论述了调车作业监测系统采用DGPS技术方案的可行性。 - Payrolls will be further trimmed by shunting staff to low-cost locations, and introducing greater automation and process efficiencies.
随着员工分流至低成本地区,引入自动化设备和提高流程效率,公司的薪资成本也会进一步削减。 - The shunting of the station works, by station dispatcher ( did not set dispatcher, by station attendant) unified leader.
车站的调车工作,由车站调度员(未设调度员的,由车站值班员)统一领导。
