MY字典>英语词典>shunting翻译和用法

shunting

英 [ˈʃʌntɪŋ]

美 [ˈʃʌntɪŋ]

v.  使(火车或火车车厢)转轨; 调往,转至(次要的地方)
shunt的现在分词

现在分词:shunting 复数:shuntings 

电力

BNC.45230

柯林斯词典

  • VERB (通常因为不方便而)将…转移至别处,将…调往别处
    If a person or thingis shuntedsomewhere, they are moved or sent there, usually because someone finds them inconvenient.
    1. He has spent most of his life being shunted between his mother, father and various foster families...
      他一生中的大部分时间都在他母亲、父亲及各种各样的寄养家庭之间辗转度过。
    2. Independent thinkers are shunted into minor jobs or refused promotion.
      见解独到的人士要么被调往次要的岗位,要么就不被提升。
  • VERB 使(火车车皮或车厢)转轨
    When railway enginesshuntwagons or carriages, they push or pull them from one railway line to another.
    1. The GM diesel engine shunted the coaches to Platform 4.
      通用柴油动力火车头将车厢转轨到了 4 号月台。

双语例句

  • Objective To analyse the causes of shunt obstructions after ventriculoperitoneal shunting for children hydrocephalus and their therapy.
    目的分析脑室&腹腔转流术治疗小儿脑积水后转流管阻塞的原因及对策。
  • How to check the filament real-time status of white light signal in a shunting signal is discussed deeply in the case of not affecting stability and safety of signal equipment in use.
    在不影响现有设备稳定性和安全性的前提下,对实时检查调车信号机白灯灯丝的情况进行探讨。
  • Shunting route: in principle, the persons who handle shunting route shall manually release the remaining shunting route.
    调车进路:原则上由办理调车进路方的人员,负责人工解锁该调车进路的遗留进路。
  • The boxcars can be rearranged at a shunting yard that has an input track, an output track, and K holding tracks between the input tracks and output tracks.
    该车厢可以重新排列在一个调车场具有一个输入采样,输出跟踪,和K之间举行的输入和输出轨轨道轨道。
  • Some shunting buttons can be used as option buttons at the same time.
    某些调车按钮可兼作变通按钮。
  • Also in the AC voltage mode, low-input shunting capacity is necessary for high-frequency operation.
    在AC(交流)电压模式中,低输入的分流容量对高频率的操作运行是必要的。
  • Some surgeons believe that shunting of the obstructed lateral ventricle is sufficient unless local mass effect causes symptoms.
    有的外科医生认为除非具有明显的占位效应,导致症状,否则受阻侧脑室分流就可以了。
  • First, it discusses the technical and economic feasibility for the shunting monitoring system to use DGPS technology.
    首先,本文从技术和经济两方面论述了调车作业监测系统采用DGPS技术方案的可行性。
  • Payrolls will be further trimmed by shunting staff to low-cost locations, and introducing greater automation and process efficiencies.
    随着员工分流至低成本地区,引入自动化设备和提高流程效率,公司的薪资成本也会进一步削减。
  • The shunting of the station works, by station dispatcher ( did not set dispatcher, by station attendant) unified leader.
    车站的调车工作,由车站调度员(未设调度员的,由车站值班员)统一领导。